DESCRIPTION: start of unit, S to N, , exterior floor
TYPE: Excavation
PERIOD:
SITE: MSJ | UNIT: 4 |
OPS: 31 | LOT: |
SUBOPS: A | LEVEL: |
AUTHOR: Antonia Foias
YEAR: 2000
Excavation: start of unit, S to N
DESCRIPTION: start of unit, S to N, , exterior floor
TYPE: Excavation
PERIOD:
SITE: MSJ | UNIT: 4 |
OPS: 31 | LOT: |
SUBOPS: A | LEVEL: |
AUTHOR: Antonia Foias
YEAR: 2000