DESCRIPTION: doorway with Floors A and B and riser into interior, , front faade of structure
TYPE: Excavation
PERIOD:
SITE: MSJ | UNIT: 8 |
OPS: 31 | LOT: |
SUBOPS: A | LEVEL: |
AUTHOR: Antonia Foias
YEAR: 2000
Excavation: doorway with Floors A and B and riser into interior
DESCRIPTION: doorway with Floors A and B and riser into interior, , front faade of structure
TYPE: Excavation
PERIOD:
SITE: MSJ | UNIT: 8 |
OPS: 31 | LOT: |
SUBOPS: A | LEVEL: |
AUTHOR: Antonia Foias
YEAR: 2000